Finished!

Finished!

All the work is done, and t he board is ready. Time to relax.

Advertisements
Image | Posted on by | Leave a comment

Layout sketches

Layout sketches

Image | Posted on by | Leave a comment

The work continues

The work continues

Day 3: Everyone is working hard to complete the project on time. Renderings are being finalized and the layout of the board is in its beginning phase.

Image | Posted on by | Leave a comment

Drawn perspective of grass slope

Drawn perspective of grass slope

A break in the harsh concrete creates a soft grassy area to congregate around

Image | Posted on by | Leave a comment

Natural 2nd floor ramp

Natural 2nd floor ramp

An organic alternative to direct traffic more efficiently.

Image | Posted on by | Leave a comment

Day two

The design is finalized and we begin to move into the production phase.  Xi works on a 3d model while Rachel and Christina compile a collage in Photoshop.  The project is moving along smoothly.

Posted in Uncategorized | Leave a comment

Grassy slope

Grassy slope

The east wall redone

Image | Posted on by | Leave a comment